In the early seventies, and during a visit to an oil production
facility, the late Sheikh Zayed Bin Sultan Al Nahyan noticed the flaring
of associated gas into the atmosphere and inquired how this can be
stopped. This was the background against which ADGAS was established in
1973 to become the first LNG production company in the whole Middle East
and North Africa (MENA) region. An agreement was signed to supply LNG
and LPG to the Tokyo Electric Power Company (TEPCO). The Company started
with two production trains and added a third one in 1994 with a total
production of over 8 million tons of LNG, LPG, and other products.
• |
Senior Construction Engineer - Contract
Hire |
|
Apply Here |
• |
Lead Rotating Machinery Engineer - Contract Hire |
|
Apply Here |
• |
Senior Project Engineer - Contract Hire |
|
Apply Here |
• |
Lead Control Engineer - Contract Hire |
|
Apply Here |
• |
Senior Instrument Engineer /Specialist - Contract Hire |
|
Apply Here |
• |
Plant Inspection Engineer |
|
Apply Here |
• |
Senior Plant Inspection Engineer |
|
Apply Here |